Wednesday, July 17, 2013

Almost there

Lots of additional progress towards the end-goal...  I expect to take the car down the street later this week (to the muffler shop) for a new exhaust system and alignment.  I will be using Magnaflow components on the exhaust.

I have completed most of the other tasks:

  • Installed all new carpet (what a PITA!).  I got the heavy "mass backing" with Loop Carpet and it is nice, but makes it difficult to work with.
  • Seats are back in
  • Upgraded the stereo - removed electric antenna - installed stubby
  • Installed a NB gauge cluster - rewired dash
  • Installed Dakota Digital Speed calibrator
  • Installed the Audi CV boots on axles
  • Installed FM Little Big Brake Kit
  • Put the fenders / nose back on
  • Rolled said fenders (front and back)
  • Received wheels/tires (Toyo R1R 225/45/15 on J-Speed wheels) 
  • Ordered long lugnuts from 949 Racing
  • Cut the rear bumper cover for dual exhaust - just made it look like the other side.


Left to do:

  • Bleed brake/clutch systems
  • Get Exhaust installed
  • Alignment
  • A/C fill
  • Revisit all nuts/bolts to ensure torque
  • Fix windows (switch is flaky)
  • Install NACA duct on Driver's headlight cover

Pictures:









This is the style switch I'll be building for the windows.  Much more retro and cool than the plastic POS that is came with.

Duct I plan to use on the headlight cover

No comments:

Post a Comment